Study Committee Proposals
for Completing the 2nd floor
(Updated November 5, 2006)
Your Study Committee has the responsibility to review and
evaluate the existing space needs on an immediate basis,
a short term basis, and a long term basis. We have prayed
for God's guidance in our efforts. The proposal below for
completion of the 2nd floor addresses the short term needs
and is based on our goal to maximize the greatest use of
the space to provide the greatest services at Heritage
for God's work.
PLEASE, all comments are welcome. If you have suggestions,
email your response to
We have attempted to encourage any and all
interaction. We are committed to have this effort be an
HUMC effort, a fellowship of building stewardship. Thank
you sincerely to those who have offered remarks,
information, and suggestions.
Current plans include:
- Children's Sunday School classes:
More space for Children's Sunday School classes.
Move Children's Director office to current Bridal
dressing area. Security/welcoming/presence/strength
of program/closer to other staff offices.
Move Bridal dressing area to Choir Room temporarily.
Security for Choir Room offered. Install
hooks/mirror/dressing items permanently for
Choir/Drama use. Install blinds on north/south
hall windows. Move 1/more, as needed, Adult Sunday
School classes, temporarily. Possible locations
discussed/Fellowship Hall. Possibly combining some
Adult Sunday School classes temporarily. Number of
groups needing Sunday School space
discussed. Assigning 2nd Fl Rms.
- Education Wing:
Remodel/decorate Education Wing into Children's
Wing, as building campaign progresses. Theme was
prepared for rooms; hall-paint is donated.
- Kitchen:
Install open island for storage in kitchen.
Commercial fridge/freezer/kitchen equipment.
- Security:
Directional signs/security/keypads. Security
coordinator.
- Prayer Room:
Complete space between 2 buildings as Prayer
Room/storm shelter for GPS registration. Install
gate/locked doors to Education Wing. Current Prayer
Room available for office/counseling (for example,
for Youth) etc.
- Workroom:
Enlarge 1st Floor Workroom for storage/file
cabinet by finishing out corner. Possibly using
sliver of that space for diaper changing area for
Women's Restroom.
- Balcony:
Complete Balcony floor on west side, squaring
railing for sitting area/library area etc.
- Sand volleyball pit:
Sand volleyball pit for youth. Must determine
easement, etc.
- Parking:
Gravel parking area on west side; allow space
for visitor parking on east side.
- Playground.:
Install door on north side to allow youngest to
playground area at back of building/safety. Three
sections/low fencing to separate areas.
Safety/approved ground material. Privacy/6' fence.
Equipment per age group.
- Second Floor:
Elevator to accommodate gurney at north end of
north-south hall. Move glass double doors just east
at bottom of stairway. Heavy, soundproof partitions
to allow maximum usage of classrooms. Coffee nook.
Enlarged storage area. Wedding area Rooms 9, 10, 11.
Relocate current wedding provisions to Room 9.
Mechanical area to Rm 7, above mechanical area in
Choir Room on 1st Floor. Overflow of Youth to Room 8,
as needed.
The Study Committee prays for God's blessing of these
proposals for growth of His Church. Let us work together
to grow God's plan.
"This is what the Lord says: Are you the
one to build me a house to dwell in?"
(2 Sam 7:5)